Quality & Safety

Safety

Safety Training Guidelines

Pre-project site safety planning

Safety toolbox talks

Strict adherence to the use of personal protective equipement

Weekly mandatory safety meeting

Daily site planning

Daily job site hazard analysis

Safety Measures During Project Execution

Display of working signs and caution boards in working area

Inspectioned carried out to ensure safety measures should be taken with serious note

Licensed electrical staffs on the site

Using of insulated hand tools for working with electrical lines/ equipment

All electrical safety measures should be taken before work execution

All necessary protective personal measures should be provides to workers and staffs

Quality Cycle Phase

Quality Measures during Project Execution

Detailed Engineering and requirement analysis of Client's Technical documentation.

Material Ordering as per technical Specification and Duly approved by the Customer.

When material received at site, quality check will takes place for all the items and necessary actions taken against Defects or deficiency.

In Process of Manufacturing cycle necessary steps taken to ensure product quality before delivery.

A preliminary and final Inspection of proposed materials shall be carried out with the Customer to ensure integrity.

Supply of Materials after successful Inspection along with transit insurance and safe delivery at the site

Material unloading at site with full safety guidelines to avoid damage to materials

Material installation at site as per the compliance with respective IEC and ISO standards.

Pre-commissioning takes place before Joint inspection to check and rectify defects for ensuring quality work delivery to client.

Approval Order to be received from The Client to initiate charging and hand over.

Hand over the site to customer after the receipt of Hand over order with maintenance and operations guidelines.

Tender close out and final settlement.

Timely service during warranty period towards any defects.